Realization

Implementation of the air recuperation system ATREA for ventilation and temperature control in the property along with the placement of the Mitshubishi Zubadan air-to-water heat pump - 11 kw interconnected to the NADO 1000L accumulation vessel and subsequent integration into the heating system and DHW preparation - Frýdlant - 2019

Installation of 8kw R32 air-to-water heat pump consisting of outdoor unit Mitsubishi Zubadan Inverter-New Generation PUHZ-SHW80YAA and indoor unit EHSC-YM9EC and subsequent connection to existing heating system - Liberec XI-Růžodol I - 2022

Installation of an air-to-water heat pump consisting of outdoor unit Mitsubishi Zubadan Inverter-New Generation PUHZ-SHW112YAA, indoor unit EHSC-YM9EC, 2 pump groups for underfloor and radiator heating and DHW preparation with subsequent integration into the heating system - Brada-Rybníček - 2021

Installation of 12kw R410 air-to-water heat pump consisting of Mitsubishi Zubadan Inverter-New Generation outdoor unit PUHZ-SHW112YAA, indoor unit EHSC-YM9EC and Meibes pump group with subsequent connection to the existing heating system - Brada-Rybníček - 2022

Installation of an an air-to-water heat pump 8kw R32 consisting of a Mitsubishi Zubadan Inverter-New Generation outdoor unit PUHZ-SHW80YAA, an indoor unit EHSC-YM9EC and a pump group Meibes with subsequent connection to the existing heating system in further connection to the implemented accumulation vessel TECHTRANS PAST 750 L - Dětřichov - 2022

Installation of a heat pump air-to-water consisting of: outdoor unit Mitsubishi Zubadan Inverter-New Generation PUD-SHWM120YAA and indoor unit EHST20D-YM9ED equipped with an integrated accumulation vessel - 200 L and subsequent integration into the existing heating system - Jičín - 2021

Installation of a heat pump air-to-water consisting of: outdoor unit Mitsubishi Zubadan Inverter-New Generation PUD-SHWM120YAA and indoor unit EHST20D-YM9ED equipped with an integrated accumulation vessel - 200 L and subsequent integration into the existing heating system - Libošovice - 2021

Installation of a heat pump air-water Mitsubishi Zubadan 14kW with a coolant exchanger located directly in the accumulation vessel TECHTRANS PAST 750 L - Jablonné v Podještědí - 2012

Installation of the air-to-water heat pump Mitsubishi Zubadan 11kW and its connection to the heating system - Rožďalovice - 2015

Installation of the air-to-water heat pump Mitsubishi Zubadan 11kW and its connection to the heating system - Liberec IX - Janův Důl - 2016

Installation of Mitsubishi Zubadan 11kW air-to-water heat pump with hot water distribution and subsequent connection to the heating system and DHW preparation of the property - Czech Paradise - 2014

Installation of 12kw R410 air-to-water heat pump consisting of Mitsubishi Zubadan Inverter-New Generation outdoor unit PUHZ-SHW112YAA, indoor unit EHSC-YM9EC and Meibes pump group with subsequent connection to the existing heating system - Brada-Rybníček - 2022

Installation of Mitsubishi Zubadan 14 kw air-to-water heat pump, underfloor heating and an accumulation vessel TECHTRANS PAST 750 L - Czech Paradise - 2014

Installation of air-to-water heat pump Mitsubishi Zubadan Inverter-New Generation/PUHZ-SHW80YAA with folded indoor unit for the preparation of DHW and an additional heating - Přepeře - 2018

Installation of the air-water heat pump Mitsubushi Zubadan 11kW to the heating system of the property - Heřmanice in Podještědí - 2014

Installation of solar thermal collectors along with a heat pump and an accumulation vessel Techtrans PAST 1200 l - Kunratice u Cvikova - 2012

Installation of a heat pump to the property equipped only with the electric heaters and masonry heater - Bílý Kostel nad Nisou - 2011

Installation and subsequent integration of a system of solar collectors, a heat pump into the existing system for heating and additional preparation of DHW for the resident whirlpool and swimming pool - Frýdlant (Antonie Resort) - 2012

Installation of air-water heat pump Mitsubishi Power Inverter 7.5 kw, an accumulation vessel NADO - 500 L and underfloor heating Tiemme 2x4 together with heating ladders - Velké Přílepy - 2014

Installation of air-water heat pump Mitsubishi Zubadan 14 kw and replacement of the old combustion boiler with a newer one - Libošovice - 2016

Installation of an air conditioning and a heat pump Mitsubishi MSZ-SF50VE / MUZ-SF50VE - Liberec VIII - Dolní Hanychov - 2016

Installation of air-to-water heat pump - Mitsubishi Zubadan - 23 kW - PUHZ-SHW230YKA/E*SE-**C and further implementation into the existing heating system for heating and preparation of DHW together with an accumulation vessel TECHTRANS PAST 750 L - Žandov u České Lípy - 2016

Installation of air-to-water heat pump Mitsubishi Power Inverter 7.5 kw - PUHZ-SW75VKA and ACV-COF-240 L vessel for preparation of DHW together with Tiemme underfloor heating system, Jablotron control panel, ladders and radiators. The implementation was expanded to also include the implementation of the recuperation Atrea Duplex 370 EC4.D.CF - Liberec II – Nové Město - 2016

Installation of a new heating system using 2 heat pumps air-to-water - 2x14 kw and its implementation into the existing heating system and 2 accumulation vessels - 2x 1000 L into the apartment building - Prague-Letňany - 2021

Installation of air-to-water heat pump Mitsubishi Zubadan Inverter - 6 kW - PUD-SHWM60VAA and indoor unit EHST20D-VM2D with an integrated boiler - 200 L and subsequent integration and connection to the heating system and the preparation of DHW - Stráž nad Nisou - 2023

Project realization of photovoltaic system - 9,6 kWp 3x1f 14,4kWh and air-water heat pump Mitsubishi Zubadan Inverter - 8 kW - PUHZ-SHW80YAA in cooperation with PV system and subsequent connection to the electrical grid and heating system and the DHW preparation of the property and further connection to the newly placed TECHTRANS PAST 750 L storage tank - Hořice - 2023

Installation of photovoltaic system - 9,2 kWp (Risen RSM40-8-400M, hybrid inverter GoodWe GW10K - ET) 3x1f 14,2 kWh (PYLON FORCE H2 FH9637M HV) and heat pump air-water Mitsubishi Zubadan Inverter - PUD-SHWM140YAA 14 kW in cooperation with the PV plant and subsequent connection to the electricity grid and heating system and DHW preparation of the property - Bedřichov - 2022

Project realization of photovoltaic system - 9,6 kWp 3x1f 14,2 kWh (Risen Mono RSM120-8-400M, hybridní měnič GoodWe GW10K-ET) and air-water heat pump Mitsubishi Zubadan Inverter - PUHZ-SHW80YAA - 14 kW in cooperation with PV system and subsequent connection to the electrical grid and heating system and DHW preparation of the property and further connection to the newly placed accumulation vessel TECHTRANS PAST 750 L - Liberec XI – Růžodol I - 2022

Installation of air-to-water heat pump Mitsubishi Zubadan Inverter - 7,5 kW - PUHZ-SW75YAA and indoor unit Ecodan - Next Generation EHST20C-YM9EC with integrated 200 L boiler and subsequent integration and connection to the heating system and DHW preparation - Babice nad Svitavou - 2022

Reconstruction of the existing boiler room with subsequent installation of air-to-water heat pump Mitsubishi Zubadan Inverter PUD-SHWM140YAA/EHS-YM9ED - 14kW, accumulation vessel TECHTRANS and parallel installation of photovoltaic system with an output of 9.6 kWp and accumulation of 14.4 kWh - Barchovice - 2023

Reconstruction of an existing boiler room, using electric cartridge located in the accumulation vessel as the only source of heat and DHW preparation, and subsequent installation of a heat pump Mitsubishi Zubadan Inverter-New Generation - PUHZ-SHW80YAA with an indoor unit Mitsubishi Ecodan - EHSC-YM9ED, which was interconnected with the heating system of the property and put into operation - Liberec - 2023

Reconstruction of the existing boiler room and the subsequent placement and launch of a new 12 kw heat pump Mitsubishi Zubadan Inverter-New Generation - PUD-SHWM120YAA together with the Ecodan EHST20D-YM9ED indoor unit with integrated 200 L boiler for the preparation and accumulation of DHW - Jince - 2023

Installation of system of ventilation and air recuperation Duplex 300 Easy with preheating Atrea EPO-PTC 160/0,7 kW along with heat pump air - air Mitsubishi MXZ-2F53VFHZ nordic with indoor unit Mitsubishi MSZ-LN35VG2 diamond and subsequent integration into the heating system of the house with regard to synchronous cooperation with the existing photovoltaic power plant. - Zvánovice - 2023

Reconstruction of the existing boiler room and placement of a new heat pump - Mitsubishi Zubadan Inverter-New Generation - PUHZ-SHW80YAA - 8 kW along with installation of an indoor unit - Ecodan EHSD-YM9ED and subsequent connection to the existing accumulation vessel and further integration into the heating system of the property - Jablonec nad Nisou - 2023

Reconstruction of existing boiler room and installation of heat pump Buderus Logatherm WPLS 8.2 T190 Comfort - ODUS SPLIT 8 - with indoor unit and accumulation vessel Buderus IDUS13 T with a volume of 190 L for heating and DHW preparation with subsequent integration into the heating system of the property - Doubravčice - 2023

Reconstruction of existing boiler room and installation of heat pump Buderus Logatherm WPLS 8.2 T190 Comfort with indoor unit and accumulation vessel with a volume of 190 L for heating and DHW preparation with subsequent integration into the heating system of the property - Mukařov - 2023

Installation of a 9.35 kWp photovoltaic system featuring Einnova Solarline mono ESM-550S panels, complemented by 67.2 kWh of storage provided by PylonTech US5000C, all utilizing advanced Victron technology. This parallel setup also included the addition of a photothermal system with Suntime panels, air recuperation from Atrea, a Mitsubishi Zubadan heat pump with accumulation vessel PAST, and a wallbox for electric vehicle charging. The project encompassed full grid integration, system startup, and commissioning. - Fojtka - 2023

Installation of an air-to-water heat pump Mitsubishi Power Inverter PUHZ-SW100YAA with a capacity of 10 kW and an internal unit Ecodan Hydrobox EHSC-YM9D, placement of a new accumulation tank ACV Comfortline 240L, and subsequent integration into the property's heating system and domestic hot water preparation. - Nová Ves nad Nisou - 2024

Installation of an air-to-water heat pump Mitsubishi Power Inverter – PUHZ-SW75YAA with a capacity of 7.5 kW and an internal unit Ecodan Hydrobox EHSC-YM9D, placement of a new electric water heater Dražice OKC 250 NTR/HP, and subsequent integration into the property's heating system and domestic hot water preparation. - Nové Jirny - 2024
About company ENESO
Company ENESO was founded in 2009 and since its origin has been engaged in design-implementation-service of photothermal and photovoltaic solar systems, electronic security systems, GSM cameras and heating. Solar panels are used for year-round water heating in homes and are designed to make the most of the impact of the solar rays throughout the year, while at the same time returning the initial investment as quickly as possible.
More about company ENESO16
years on
the market
400+
completed
projects
300+
satisfied
customers
Eneso s.r.o.
Headquarters: Žitavská 56/50, 460 01 Liberec (map)
Prague office: Podnikatelská 565, 190 11 Praha 9 - Běchovice (Areál BĚCHOVICE KKIG budova 10A) (mapa)
Brno office: Božetěchova 133,
612 00 Brno - Královo Pole (map)
Owner & executive director: Ing. Alois Láska, Ph.D.
Phone: +420 605 502 676
Email: alois.laska@eneso.cz
IN: 22772804 │ TIN: CZ22772804
File mark:
C 30960 registered at the Regional Court in Ústí nad Labem
Want to ask? Write to us...